- Report Date: March 18, 2010
Member: James Stone
1540 S. Hametown Rd.
Akron, OH 44321
Category: Insulation
Services Performed: Yes
Work Completed Date: March 03, 2010
Hire Again: Yes
Approximate Cost: $1,500.00
Home Build Year: 1973
Description Of Work: Installed blown-in insulation in attic to a minimum R-50 value.
Member Comments: Had three bids on the project. I felt they had the best bid in terms of both quality and price.
They were quick in responding to my request to quote. They were able to start almost immediately, showed up
on time, and completed the job quickly.
Overall A
Price A
Quality A
Responsiveness A
Punctuality A
Professionalism A
ADDITIONAL QUESTIONS ANSWERED WHEN COMPLETING THIS REPORT:
How much did the final cost compare to the original estimate? Right on
How does the value of the work compare to the price? I got exactly what I paid for
How far in advance did you schedule the work? Within a week
Did you find the company through Angie's List? Yes
If yes, which source(s)? Website
Why did you choose this contractor? Other, Selected bidders by location. Best quote.
Have you used this company before? This is the first time I've used this company
What did you like most about this contractor? Promptness, quality, price.
What did you like least about this contractor? No complaints
What surprises came up during the course of the work? None
What words of advice would you give other members considering this contractor? They are worth getting a bid
from.
What words of advice would you give this contractor? None
- Report Date: November 21, 2009
Member: Carol Fricke
3535 Ingleside Road
SHAKER HEIGHTS, OH 44122
Category: Insulation
Services Performed: Yes
Work Completed Date: November 06, 2009
Hire Again: Yes
Approximate Cost: $2,830.00
Home Build Year: 1817
Description Of Work: Install insulation to two attics, a bay window and the the kitchen addition through the air
vent. Although the project was delayed slightly, the delay seemed unavoidable and I was told in a timely manner.
The type of material installed is "green", and a thermal barrier.
Member Comments: The larger attic is nearly 200 years old and is completely floored. The air conditioning
system covers much of the floor perimeter, and it is important to retain the historic character of the attic itself.
This company lifted the floor boards from the middle, and blew in the insulation that way, encountering more
barriers than would be anticipated. They re-nailed the whole floor, and left the area clean. Although I had not
known that the area above the bay window could be insulated, they told me about it, and were the only insulation
company (out of 3) who suggested this. So far, although we haven't had too much freezing weather, this has
made our TV room much more comfortable. The original plan included blowing insulation through the roofing
space from the addition attic to to kitchen: They encountered a barrier. Rather than abandon this plan, they blew
insulation through the air vent above the kitchen addition (which was apparently, a totally separate wing) thus
insulating a much larger are than would have been possible originally; This cost me more than the original
estimate, but extremely reasonably given how much more area they were covering. In all areas, the insulation
has been effective. I highly recommend this firm.
Overall A
Price A
Quality A
Responsiveness A
Punctuality A
Professionalism A
ADDITIONAL QUESTIONS ANSWERED WHEN COMPLETING THIS REPORT:
How much did the final cost compare to the original estimate? Higher than estimate
How does the value of the work compare to the price? I got more than my money's worth
How far in advance did you schedule the work? Within a week
Did you find the company through Angie's List? Yes
Why did you choose this contractor? Other, through reading remarks on Angie's list
Have you used this company before? This is the first time I've used this company
What did you like most about this contractor? He and his crew wanted to do the best possible job
What did you like least about this contractor? He tried to keep his crew working, as well as his desire to do the
best job possible which means the time it took to overcome special difficulties and conditions could interfere
with planned start
What surprises came up during the course of the work? I believe I've mentioned them
What words of advice would you give other members considering this contractor? Make sure that if you have
airtight schedule you arrange an airtight start time.
What words of advice would you give this contractor? Keep on doing a great job.